We reply within 24h
Leave this field empty
Tell us briefly which site distribution board you are looking for.
Add your document here so we can advise you accurately. Allowed: PDF, JPG, PNG, DOC or DOCX — max. 10 MB per file.
Where will the site board be placed?
You can measure the distance yourself. The grid operator's quote often indicates how to determine this correctly.
If you have a quote from the grid operator, you can add it here. It usually states the required cable cross-section. Allowed: PDF, JPG, PNG, DOC or DOCX — max. 10 MB per file.
Where will the site board be used?
When and for how long do you need the site board?
You can rent the site board for as long as you need it. The minimum rental term is 6 months.
Would you like to pick up the board yourself, or have Vivario deliver and install it?
Select what we should arrange for you.
You pick up the site board from us. We provide step-by-step instructions to install and connect it correctly.
So we can send you the quote.
Check your choices before submitting.
Not sure what to choose? Get in touch with Vivario Systems directly.
We will review your details and get back to you as soon as possible with a suitable quote for the right site distribution board.
0495435813
info@vivariosystems.be